A kitchen renovation in a Dubai villa typically costs around AED 35,000 to 120,000 or more, and a bathroom around AED 25,000 to 60,000 or more, depending on layout changes and specification. Many communities require a developer NOC when plumbing moves or kitchen joinery is replaced. Tarasukh manages the design, approvals, and contractors, with particular care on waterproofing and services, where most defects start.
What we manage
- Layout design, including moving sinks, islands, and wet areas
- Plumbing and drainage, with pressure testing before anything is closed up
- Waterproofing, flood-tested before tiling
- Electrics, lighting, and appliance power
- Extraction and ventilation
- Cabinetry, worktops, tiling, sanitaryware, and finishes
- Developer NOC where required
Why wet areas go wrong
Most expensive renovation defects in Dubai villas come from bathrooms and kitchens: leaks behind tiles, poor falls to drains, failed waterproofing, and overloaded circuits. They are invisible at handover and costly later. We inspect and test these stages before they are covered, which is where our MEP background matters most.
Typical costs
A kitchen typically ranges from around AED 35,000 to 120,000 or more, and a bathroom from around AED 25,000 to 60,000 or more. Moving plumbing, structural changes, and premium specification push costs up.
Cost figures are market ranges compiled from published 2026 Dubai renovation price guides, not quotes. Your price depends on your villa, specification, and site conditions, and should be confirmed with a site visit and itemised quotes.